The Tassc: Estimator product family is a comprehensive toolkit of advanced software components, each dealing with a specific aspect of planning, organizing and controlling the construction and development of software-intensive systems.
It provides a fresh and innovative approach to systems development and software project management, based on object-oriented, component-based and web technologies.
ObjectMatrix Mentor - a web-based guide to the award-winning software estimation process. This is an extensive technical guide, cross-referenced by hyperlinks, and many of the graphics and icons also have hot spots that lead to more information. ObjectMatrix is a software estimating process based on a set of forecasting and sizing algorithms.
The estimation process offers a practical, reliable and repeatable approach to planning, scheduling and controlling object-oriented, component-based and web-based software development projects.
The algorithms were developed from a knowledge base of over a decade of practical experience in consulting on software development projects, supported by a theoretical foundation resulting from an extensive 5-year research project. |
| |
|
| Tassc: Estimator MANAGER An advanced project management solution. |
| |
Product Features |
| |
| Estimation and Metrics |
UML Requirements and Application Scoping |
|
instant estimate of effort, duration and cost |
|
capture and structure use case requirements |
|
Optimum Resource Graph (illustrating duration against resources) |
|
identify and structure business classes and design classes (concept and concrete) |
|
export to Microsoft® Excel full estimation report in HTML (user-configurable) |
|
specify component and subsystem application architecture |
|
in-built productivity, activity and technology metrics (user-configurable) |
|
in-built standard UML classifiers |
| |
|
|
user-defined classifiers and stereotypes |
|
|
|
|
|
| |
| UML CASE Tool Import |
Team Organization |
|
Rose from Rational |
|
specify each person on the project (name, rate, skill level, availability, utilization) |
|
Component Architect from Select |
|
detailed specification of resource skill (planning, analysis, design, programming etc) |
|
Together from Together soft |
|
organise project personnel into teams of workers according to skill |
|
Real-time Studio from Artisan |
|
|
|
XMI import |
|
|
|
|
|
|
|
| |
| Risk Management |
Advanced Estimation |
|
Risk Contingency Graph (contingency percentage and estimation range) |
|
suggested project contingency percentage
|
|
describe each risk (name, full text description and status) |
|
earliest possible duration (best case scenario - if no risks fire) |
|
state the priority of each risk, and name and assign a risk owner |
|
expected duration (most probable scenario - if some risks fire) |
|
specify the probability of the risk firing and it’s potential impact |
|
latest duration (worst case scenario - if all risks fire) |
|
enter a full text description of an appropriate contingency plan |
|
|
|
|
|
|
|
| |
| Project Planning |
Project Tracking |
|
create a development process (phases, iterations and tasks) |
|
estimate to completion of the project from any point in the process |
|
define development tasks and assign to development teams |
|
statement of effort, duration and cost incurred from the start of the project to any point |
|
estimate of effort, duration and cost for each task, iteration and phase |
|
record actual effort, duration and cost for each task, iteration and phase |
|
export to Microsoft® Project (increment and task planning information) |
|
|
|
per task Optimum Resource Graph (task duration against workers assigned to the task) |
|
|
|
|
|
|
|
| |
Tassc: Estimator ENGINEER A sophisticated estimation application for technical leaders. |
| |
Product Features |
| |
| Estimation and Metrics |
UML Requirements and Application Scoping |
|
instant estimate of effort, duration and cost |
|
capture and structure use case requirements |
|
Optimum Resource Graph (illustrating duration against resources) |
|
identify and structure business classes and design classes (concept and concrete) |
|
export to Microsoft® Excel
full estimation report in HTML (user-configurable) |
|
specify component and subsystem application architecture |
|
in-built productivity, activity and technology metrics (user-configurable) |
|
in-built standard UML classifiers
user-defined classifiers and stereotypes |
|
|
|
|
|
| |
| UML CASE Tool Import |
Team Organization |
|
Rose from Rational
|
|
specify each person on the project (name, rate, skill level, availability, utilization) |
|
Component Architect from Select
|
|
detailed specification of resource skill (planning, analysis, design, programming etc) |
|
Together from Together soft (standard and XMI)
|
|
organise project personnel into teams of workers according to skill |
|
| |
|
|